- Projects
- Trove High School
Trove High School
A school site taken from bare ground to a fenced, metered distribution substation, tested by the Nigerian Electricity Management Services Agency (NEMSA) before energisation.
- Location
- Aba-Odo, Moniya, Oyo State
- Rating
- 200kVA33/0.415kVMD metered



Scope delivered
Installation of a 200kVA, 33/0.415kV transformer with maximum-demand metering, tested by NEMSA.
Scope
- 200kVA, 33/0.415kV transformer installed on H-pole structure and plinth
- 200/5A maximum-demand (MD) meter installed and configured
- Distribution substation fenced, with danger signage
- Transformer tested by NEMSA
From site