Project record

18 sites across Oyo, Kwara, Ogun, Rivers. 10 have full photo records; every entry lists the site, the scope and the rating as delivered.

The full register

Filter by the type of work. Entries marked with photos open a full case study.

Showing 18 of 18 projects

  • Budo-Efo Injection Substation

    Challenge Business Hub, Kwara Region · IBEDC

    Rehabilitation of a 2 × 15MVA, 33/11kV injection substation: switchgear, transformer auxiliaries, control room and civil works.

    2 × 15MVA33/11kV8 × 11kV panelsPhotos & scope
  • Interchange 33kV Bus Section

    Interchange injection substation

    Construction of a 33kV bus section for the 15MVA T3 transformer.

    33kV15MVA T3Photos & scope
  • Yokelepekun Injection Substation

    Monatan Business Hub, Oyo Region · IBEDC

    Construction of an 11kV feeder and installation of an 11kV indoor outgoing feeder at the 1 × 15MVA, 33/11kV Yokelepekun injection substation.

    1 × 15MVA33/11kV11kV feederPhotos & scope
  • Well Spring Estate

    Idishi, Jericho, Ibadan, Oyo

    Installation of a 1 × 1MVA, 33/11kV transformer; rehabilitation of the 33kV outdoor breaker and 11kV indoor breakers with tripping unit and transformer control panel. Rehabilitation of 2.5km of 33kV line and servicing of 300kVA and 500kVA transformers, two ring main units and feeder pillars.

    1MVA2.5km 33kV300 + 500kVA2 RMUsPhotos & scope
  • Trove High School

    Aba-Odo, Moniya, Oyo

    Installation of a 200kVA, 33/0.415kV transformer with maximum-demand metering, tested by NEMSA.

    200kVA33/0.415kVMD meteredPhotos & scope
  • Installation of a 200kVA, 11/0.415kV transformer relief substation.

    200kVA11/0.415kVPhotos & scope
  • Construction of a 6km dedicated 33kV feeder; installation of 2 × 1.6MVA, 33/0.415kV transformers; and a 33kV switch room with one indoor incoming breaker panel and two outgoing breaker panels.

    6km 33kV2 × 1.6MVA33/0.415kVPhotos & scope
  • Jogor Centre

    Jogor Centre

    Construction of 6 spans of 33kV line and installation of 500kVA and 1.5MVA, 33/0.415kV transformers.

    6 spans 33kV500kVA + 1.5MVA33/0.415kVPhotos & scope
  • De Manchy Hotels & Suites

    Felele, Ibadan, Oyo

    Construction of 1km of 11kV line and installation of a 100kVA transformer.

    1km 11kV100kVAPhotos & scope
  • M & K Enterprises

    Molete, Ibadan, Oyo

    Construction of 500m of 11kV line and installation of a 100kVA, 11/0.415kV transformer.

    500m 11kV100kVA11/0.415kVPhotos & scope
  • Deris Courts

    Sabo, opposite Mokola Barracks, Ibadan, Oyo

    Installation of a 500kVA, 11/0.415kV transformer.

    500kVA11/0.415kV
  • Senator Ideozu residence

    Off Stadium Road, Port Harcourt, Rivers

    Installation of a 300kVA, 11/0.415kV transformer.

    300kVA11/0.415kV
  • Owu Crown Hotels

    Monatan, Ibadan, Oyo

    Construction of an 11kV feeder.

    11kV feeder
  • Challenge

    Challenge, Ibadan, Oyo

    Installation of a 500kVA, 11/0.415kV transformer.

    500kVA11/0.415kV
  • Young Legacy Petroleum Industry

    Ojota, Ilorin, Kwara

    Construction of 5 spans of 33kV line and installation of a 1MVA, 33/0.415kV transformer.

    5 spans 33kV1MVA33/0.415kV
  • New Dimension Industries

    Industrial Estate, Ibadan, Oyo

    Installation of a 100kVA, 11/0.415kV transformer.

    100kVA11/0.415kV
  • University of Ilorin

    Ilorin, Kwara

    Vegetation control along a 33kV feeder.

    33kV feeder
  • Molete 33kV Industrial Feeder

    Molete, Ibadan Region, Oyo

    Rehabilitation of a 33kV industrial feeder.

    33kV feeder